Detailed Estimate

Your design is ready.
Know the cost before you commit.

Our team reviews your scheme by hand and issues a report: the estimated construction cost, what that figure rests on, what sits outside it, and what still needs checking — so you can decide with numbers instead of guesses.

$199 USDEstimate report on its own
$1,100 / $1,400 USDDrawing package (estimate included)

Prices in USD, tax included. Nothing is paid on this page — the buttons below simply take you to the right place.

How far do you want to take it?

Start with a JFA design or your own scheme. Choose the report to answer the cost question, or the package when you are ready to discuss the project further.

$199USD

All prices include tax.

A reviewed report for the design you choose: the estimated cost and what it rests on, the scope outside it, and your next step — before you decide on drawings.

Best time

When you want to check the cost before committing to drawings.

Reviewed estimate

  • A cost estimate reviewed by our team — with its pricing basis and assumptions stated
  • Broken down by floor area, with structure system and design loads identified
  • The design version it was built from, and the date of the price basis

Design & site information

  • A dimensioned floor plan with the window and door schedule
  • Your building shown placed on the plot
  • A rendered image of your design

Preliminary drawing set

  • Not included

Outside the scope

Engineering, structural design, approvals, a supply quotation or a fixed construction price.
Choose my design to get the estimate

Tell us about your design — nothing is charged on this page.

Standard or custom? It is the design you start from — not the quality of the documents. Both get the same set and the same Detailed Estimate. Standard documents one of our published designs, with changes limited to existing window and door sizes, colours and its placement on your plot. Custom documents your own finished scheme, or a published design changed beyond that. Preparing the scheme itself is a separate service. "" — ""

Three questions the review answers

A number on its own is not much use. What matters is what it rests on, what it excludes, and what nobody has checked yet.

01

What will it cost — and what is that based on?

The estimated cost to build the design you submitted, broken down by floor area, with every assumption written beside the figure so you can see what would move it.

  • Cost estimate reviewed by our team, tax included, split by floor area
  • The basis: structure system, design loads and zoning, and the date of the price basis
  • The design version it was built from
JFADetailed Estimate

Your design, costed.

Sample · a published 180 m² design US$342,000 Indicative, tax included · ≈ US$1,900/m². Your report states the reviewed figure for your own design.
StructureTimber frame, engineered
LoadsBaseline zone assumed
Price basisDated in the report
Valid30 days from issue · 30

Sample only · your report is built from the design version you submit.

02

What do I still have to arrange and budget for?

We price our own scope. The report lists — and deliberately does not put a number on — the scope your contractor and consultants price. That list is often the most useful page in it, because it is where budgets break.

  • What we price versus what others price
  • Site, approvals and services — priced for your site
  • Construction and fit-out — priced for your choices
JFAProject budget

The whole project, in view.

Priced by JFA
  • The cost estimate for your design — this report
  • Stage one preliminary drawings, if you choose them
Priced by others
  • Survey and boundaries
  • Soil investigation
  • Approvals and statutory fees
  • Earthworks and site preparation
  • Foundations or slab
  • Power, water, sewer, stormwater
  • Delivery, quoted once the site is confirmed
Priced by others
  • Erection of the frame
  • Roofing and stormwater
  • Window, door and skylight units
  • Linings, insulation, ceilings
  • Kitchen, bathrooms, laundry
  • Electrical and plumbing fit-out
  • Finishes, decks, landscaping

Take it to your contractor and your lender: they price this scope, and the lender reviews the budget that results. No total, by design.

03

What do we know — and what still needs checking?

Every fact carries its status and its source. What public records show, what you told us and what still needs a professional are kept strictly apart.

  • Each item marked by status and source
  • Unread or unmapped layers stated — never treated as clear
  • What to resolve, provide and investigate next
JFAWhere your project stands

Known. Told. To check.

Design loadsKnown
Footprint within the plotKnown
Soil testTold
Flood and drainageTo check
Easements and setbacksTo check
Ground levelsTo check

"To check" means nobody has looked yet — never that there is nothing there.

What "reviewed by a person" means

A member of our team reads the design, the pricing basis and what is still unknown before the report is issued, and holds it back if something needs fixing first. It gives you a clearer basis for a decision — not a promise of an all-in construction price. It is not checked or approved by a cost consultant, engineer, authority or lender, and we are not your contractor or certifier.

What the report contains

Ten sections, written for your design and your site. Below is the structure — yours is built from your own scheme, not a template.

01 / 10

Two-storey schemes also carry an upper-floor plan. Larger plots also carry a location plan. Preliminary documents are for early project and planning discussions — they are not construction drawings and not for certification.

Your next step

Check the cost first, or gostraight to drawings.

Either way your Detailed Estimate is reviewed by a person. Inside a package it comes included.

Check the cost

Detailed Estimate

US$199 tax included

Before you spend anything on drawings, get a reviewed estimate of what your design will cost and what that figure rests on.

Start my estimate →

Not sure which fits? Tell us about your project — a person reads every enquiry and will say which one you actually need.

How it works

Both products are prepared from the version you submit — later edits do not change what was issued to you.

Detailed Estimate · US$199
  1. Send us your designA design of ours you like, or your own drawing set. No subscription needed.
  2. If you have a site, place it on the siteNo site yet? You can still order — the report explains what to look for when you choose one.
  3. Answer a few short questionsAbout the plot: soil, power, water, drainage. "Not sure" is a fine answer.
  4. We review it and email the reportA PDF valid 30 days from issue, built from the design recorded with your order.

Timing. Your report is emailed once the review is complete. We do not publish a turnaround time here — if you have a deadline, ask us before you order. Later changes. An updated estimate for a changed scheme or site is a revision ($79). A revised drawing set follows our terms.$79

What this is. The Detailed Estimate is an indicative cost estimate prepared from the design version you submit, reviewed by our team and valid 30 days from issue. It is not a supply quotation, a fixed construction price, an engineering design, an approval or a certification, and it does not replace the professional advice of a quantity surveyor, structural engineer, registered surveyor, approval authority or lender. 30